Montesano Bros. has been entrusted with the expansion and construction of vital water treatment plants throughout the tri-state area.
Village of Goshen Wastewater Treatment Plant
- Goshen, NY
This $17-million project consisted of the excavation and removal of approximately 80,000-cubic-yards of fill and the importation of roughly 75,000-cubic-yards of material. The Goshen project required excavation for a headworks facility, two oxidation ditches, two secondary clarifiers, a post-aeration operation building, and a RAS/WAS pump station. More than 5,000 linear feet of water, sewer, and drainpipes were installed, ranging in diameter from 4 to 30 inches at depths up to 12 feet. Montesano Brothers also built 1,000 feet of new roadway.